This week has seen the Living Room tiled out and the fireplace put in. The fireplace is a large slab of stone from the old barn, cut into the wall, and held up at the front with 4 inch pipe full of concrete. The slab was VERY heavy, so we used the tractor to lift it, then rolled it through the living room door. The little pallet lifter then came into play to move it in and out while cutting the wall to fit. The pipe has been painted matt black to match the wood burning stove which will sit on top. Job Done! One wall in the hall has been plastered, ready for the stairs to be erected, and then the floor in the kitchen, lobby and small toilet made ready for tiling next week. Good progress again.